1. The valuation formula that cuts Section 232 duty bills in half
For qualifying USMCA imports from Canada or Mexico, the dutiable Section 232 base is Total Customs Value − Verified U.S. Content Value. If a $1,000 automotive bracket assembled in Monterrey uses $620 of U.S. melted-and-poured steel coil and U.S. fasteners, a verified split limits the 25% Section 232 tariff to the $380 non-U.S. portion ($95 instead of $250—saving $155 per unit).
2. Four-step documentation packet for CBP ACE entry
- Confirm USMCA General Note 11 eligibility first: Review our USMCA Joint Review Importer Checklist to ensure your certificate of origin is current.
- Collect upstream U.S. mill & foundry certificates: Obtain steel melt-and-pour, aluminum smelt-and-cast, or copper smelt-and-cast certificates showing U.S. heat numbers.
- Split commercial invoice values cleanly: Show U.S. content value vs. non-U.S. content value on the customs invoice so your broker transmits accurate split lines in ACE (following CBP's Chapter 99 reporting sequence).
- Verify net savings via GetTariff: Model full-value vs. non-U.S. content scenarios with our Tariff Calculator or
calculate_us_import_dutyvia MCP athttps://www.gettariff.com/api/mcp.
Official sources
- Official USITC tariff schedule — check the current schedule, chapter notes, and applicable Chapter 99 provisions.
- USITC: HTSUS General Note 11 (USMCA Rules of Origin)
- CBP: USMCA Implementation Instructions & ACE Guidance
- BIS: Section 232 U.S. Content Valuation Guidance
This guide is general information, not a duty determination. Confirm classification, origin, applicable measures, and the entry date with a licensed customs broker.